PROJECT SUMMARY
Redevelopment of former factory to 3 No. storage and high bay distribution warehouses.
otal development 98,000 sq.ft
Steel portal frame with large span (68m)
£3.3 million Design & Build Contract
Services – Architectural
Each of the 3 units is set back from its local road in order to incorporate a secured front yard. In response to client-specific requirements, the design of Unit-2 has its own character being a high-bay warehouse 10.7m from finish floor level to the underside of steel haunch. The elevation treatment on two facades was enhanced by using ribbon windows completed with silver & grey shaded bands and trimmers of metal cladding. The form of Unit-2 betrays a 2-storey amenity block around its south-east corner together with a distinguished extent of storage warehouse and loading facilities.